日本www色-日本www色高清视频-日本www色视频-日本www色视频成人免费-日本www色视频成人免费免费-日本www色视频成人免费网站

Service Hotline:
+86-578-3152686
Current Location :NEWS

Installation and Testing of Sawing Machine

* from : * Author : admin * Publication time : 2023-09-13 * Browse : 0
1、 The hydraulic oil on the sawing machine should be added sufficiently, and a layer of engine oil should be applied to the sliding and rotating parts.
2、 Install the saw belt on the band saw machine, adjust the tightening device (rotate the left handle of the saw frame) to tighten the saw belt to the appropriate level, and adjust the travel switch contact to just touch the stopper, which is in the open state.
3、 Add enough coolant to the cooling water tank.
4、 After completing the above preparation work, connect the power supply and ensure that the grounding is standard and reliable. Turn on the power switch (on the electrical control box), start the saw test run, correct the wiring according to the direction indicated on the label, and listen for its normal sound. During operation, make the saw bow automatically lower, so that the saw band drops 0.5~1mm below the workbench. When the limit switch head collides with a collision block, it will automatically rise. Whether to automatically stop when reaching the limit position height, and conduct three consecutive experiments. During operation, adjust the tension device to be in a relaxed state, make the travel switch contact leave the collision block, power off and shut down, and conduct three consecutive experiments.
5、 Check the lifting and lowering oil cylinder devices, check whether the saw bow is lifted and lowered reliably and flexibly.
6、 Check the clamping and loosening oil cylinder devices, check whether the clamping is reliable and whether the loosening is flexible.
7、 Adjust the speed control knob to run at 1st gear (low speed) and then at 2nd gear (high speed), and repeat the experiment three times.
8、 After the power switch of the main motor is turned on, the water pump starts correspondingly and the cooling system operates normally. Debug the valve and check if the coolant is smooth.
9、 After completing the above preparation work, clamp and lock the material for trial sawing.
主站蜘蛛池模板: 香蕉视频网站在线观看| 老色鬼久久综合第一| 九九视频在线观看视频| 福利姬在线播放| 97在线视频免费观看| 在线视频免费观看a毛片| 亚洲欧美在线一区| 日韩成人影视| 久久精品视频亚洲| 国产亚洲精品久久久久91网站| 国产1级毛片| 884hutv四虎永久7777| 亚洲欧美日韩国产综合| 四虎永久免费地址| 男人天堂a在线| 国产偷国产偷在线高清| 最新国产精品久久精品| 亚洲精品香蕉一区二区| 日本jizz中国| 九九精品成人免费国产片| 草免费视频| 亚洲国产精品国产自在在线| 欧美一区二区三区不卡片| 久久免费播放视频| 国产午夜免费| 2345成人高清毛片| 亚洲 欧美 视频| 日本免费毛片在线高清看| 久久国产精品久久| 国产精品视频在线观看| 有色视频在线观看| 天天射日日操| 免费av一区二区三区| 国产精品免费久久久免费| 伊人a.v在线| 日本特黄一级午夜剧场毛片| 久久午夜国产片| 国产a v高清一区二区三区| 亚洲青色在线| 欧美特级大片| 九九热久久免费视频|